Table Of ContentAuthor Index to Volume 53 
Alonso-Meijide, J.M., and Fiestras-Janeiro, M.G.: The Ban-  Dai, Y., Chao, X., Fang, S.-C., and Nuttle, H.L.W.: Capac- 
zhaf Value and Communication  Situations,  198  ity Allocation  with Traditional  and  Internet  Channels, 
Andradottir,  S.: See Argon, N.T., 508  772 
Anily,  S., and  Tzur,  M.:  Algorithms  for the  Multi-item  Daskin, M.S.: See Chen, G., 617 
Multi-vehicles  Dynamic Lot Sizing Problem,  157  Deng, S.: See Oum, Y., 697 
Archibald,  T.W.,  McKinnon,  K.I.M.,  and  Thomas,  L.C.:  Deshpande, V.: See Zhao, H., 547 
Modeling the Operation of Multireservoir  Systems Us- 
ing Decomposition  and Stochastic  Dynamic  Program-  Elsayed, E.A.: See Liao, H., 576 
ming, 217  Erdem,  A.S.,  Fadiloglu,  M.M.,  and Ozekici,  S.: An EOQ 
Argon, N.T., and Andradottir,  S.: Replicated Batch Means  Model  with Multiple Suppliers and Random  Capacity, 
for Steady-State Simulations,  508  101 
Fadiloglu, M.M.:  See Erdem, A.S.,  101 
Babich,  V.: Vulnerable  Options in Supply Chains:  Effects 
Fang, S.-C.: See Dai, Y., 772 
of Supplier Competition, 656 
Fang, X.: See Maillart, L.M., 804 
Baik,  J., Murthy,  D.N.P.,  and  Jack,  N.:  Erratum:  Two-  Fiestras-Janeiro,  M.G.:  See Alonso-Meijide, J.M.,  198 
Dimensional  Failure  Modeling  with  Minimal  Repair,  Fry, M.J.: See Liu, Y., 485 
115 
Ball, M.: See Vossen, T., 75 
Gaudioso,  M.: See Moccia, L., 45 
Bard,  J.F.,  and  Rojanasoonthon,  S.:  A Branch-and-Price  Gaver,  D.P., Jacobs,  P.A., Samorodnitsky,  G., and Glaze- 
Algorithm  for Parallel  Machine  Scheduling  with Time  brook, K.D.: Modeling and Analysis of Uncertain Time- 
Windows and Job Priorities, 24  Critical Tasking Problems, 588 
Benson, H.P.: Maximizing the Ratio of Two Convex Func-  Giloni, A., Sengupta, B., and Simonoff, J.S.:  A Mathemat- 
tions over a Convex Set, 309  ical Programming Approach for Improving the Robust- 
Berk, E.: See Ozkaya, B.Y., 525  ness  of Least Sum of Absolute  Deviations  Regression, 
Birge, J., and Linetsky, V.: Introduction to the Special Issue  261 
on Applications of Financial Engineering in Operations,  Glazebrook,  K.D.: See Gaver, D.P., 588 
Production,  Services, Logistics, and Management, 601  Golany, B., and Rothblum, U.G.: Inducing Coordination in 
Birge, J.R.: See Xu, X., 641  Supply Chains through Linear Reward Schemes,  | 
Breit, J.: See Kubzin, M.A.,  16  Giirler, U.: See Ozkaya, B.Y., 525 
Gurnani,  H., and Xu, Y.: Resale  Price  Maintenance  Con- 
tracts with Retailer Sales Effort: Effect of Flexibility and 
Cakanyildirim,  M.: See Huh, W.T.,  137 
Competition, 448 
Carrasco, J.A.: See Temsamani, J., 318 
Cetinkaya, S.: See Toptal, A., 397 
Hohzaki,  R., Kudoh,  D., and  Komiya,  T.:  An  Inspection 
Cha, J.H.:  A Stochastic  Model  for Burn-In  Procedures  in 
Game:  Taking  Account  of Fulfillment  Probabilities  of 
Accelerated Environment,  226 
Players’  Aims, 761 
Chao, X.: See Dai, Y., 772 
Hong,  L.J.:  Fully  Sequential  Indifference-Zone  Selection 
Chen, G., Daskin, M.S., Shen, Z.-J.M., and Uryasev, S.: The  Procedures with Variance-Dependent Sampling, 464 
a-Reliable  Mean-Excess  Regret  Model  for Stochastic  Huh, W.T., Roundy, R.O., and Cakanyildirim, M.: A Gen- 
Facility Location  Modeling, 617  eral Strategic Capacity Planning Model  under Demand 
Chen,  Y.(F.), Ray, S., and Song, Y.: Optimal  Pricing and  Uncertainty,  137 
Inventory  Control  Policy  in Periodic-Review  Systems 
with Fixed Ordering Cost and Lost Sales,  117  Jack, N.: See Baik, J., 115 
Chen, Z.-L.:  See Li, C.-L., 298  Jacobs, P.A.: See Gaver, D.P., 588 
Cordeau, J.-F.: See Moccia, L., 45  Jacobson,  S.H.:  See McLay, L.A.,  183 
Cruz, J.M., Nagurney,  A., and Wakolbinger, T.: Financial  Jain,  A.: Priority  and Dynamic  Scheduling  in a Make-to- 
Engineering of the Integration of Global  Supply Chain  Stock Queue with Hyperexponential  Demand, 363 
Networks and Social Networks with Risk Management,  Jeffcoat,  D.E.,  Krokhmal,  P.A., and Zhupanska,  O.I.:  Ef- 
674  fects of Cueing in Cooperative Search, 814 
© 2006 Wiley Periodicals, Inc.
Naval Research Logistics,  Vol. 53 (2006) 
Jin, N., and Zhou,  S.: Data-Driven  Variation  Source  Iden-  Maillart, L.M., and Fang, X.: Optimal Maintenance Policies 
tification  for Manufacturing  Process  Using the Eigens-  for Serial,  Multi-machine  Systems  with  Non-instanta- 
pace Comparison  Method,  383  neous  Repairs, 804 
Makis, V.: See Lin, D., 477 
Martinez-de-Albéniz,  V., and Simchi-Levi, D.: Mean-Vari- 
Kamrad,  B., and Ord, K.: Market  Risk and Process  Uncer- 
ance Trade-offs  in Supply Contracts,  603 
tainty  in Production  Operations, 627 
Mason,  S.J.: See Yeung, T.G., 285 
Kaspi, M.: See Shabtay,  D., 204 
McKinnon,  K.I.M.:  See Archibald,  T.W., 217 
Kim, S.: See Lee, Y.,  170 
McLay, L.A., Jacobson, S.H., and Kobza, J.E.:  A Multilevel 
Kobza, J.E.:  See McLay, L.A.,  183 
Passenger Screening Problem for Aviation Security,  183 
Komiya, T.: See Hohzaki,  R., 761 
Moccia, L., Cordeau, J.-F., Gaudioso,  M., and Laporte, G.: 
Koulamas,  C., and  Kyparisis,  G.J.:  A Heuristic  for Maxi- 
A Branch-and-Cut Algorithm for the Quay Crane Sched- 
mizing the Number of On-Time  Jobs on Two Unofirm 
uling Problem  in a Container Terminal, 45 
Parallel  Machines,  568 
Morton,  A.:  Structural  Properties  of  Network  Revenue 
Krokhmal,  P.A.:  See Jeffcoat,  D.E., 814 
Management  Models:  An Economic  Perspective, 748 
Kubzin,  M.A., Strusevich, V.A., Breit, J., and Schmidt, G.: 
Murphey,  R.: See Zabarankin,  M., 728 
Polynomial-Time Approximation Schemes for Two-Ma- 
Murthy, D.N.P.:  See Baik, J., 115 
chine Open Shop Scheduling with Nonavailability Con- 
straints,  16 
Nagurney, A.: See Cruz, J.M., 674 
Kudoh,  D.: See Hohzaki,  R., 761 
Nanda,  S.: See Pendharkar,  P., 432 
Kunnumkal,  S.: See Topaloglu,  H., 822 
Nelson,  B.L.:  Editorial,  181 
Kvam,  P., and Sokol, J.S.:  A Logistic  Regression/Markov 
Nelson,  B.L.:  From  the Editor:  Technical  Notes  in NRL, 
Chain  Model  for NCAA  Basketball,  788 
727 
Kwon,  I.: See Lee, Y.,  170 
Nuttle, H.L.W.:  See Dai, Y., 772 
Kwon, R.H., Rogers, J.S., and Yau, S.: Stochastic Program- 
ming  Models  for  Replication  of  Electricity  Forward 
Ord, K.: See Kamrad,  B., 627 
Contracts  for Industry, 713 
Oren, S.: See Oum, Y., 697 
Kyparisis, G.J.:  See Koulamas, C., 568 
Oum, Y., Oren, S., and Deng, S.: Hedging Quantity Risks 
with Standard  Power Options in a Competitive Whole- 
Laporte, G.: See Moccia,  L., 45  sale Electricity  Market, 697 
Lee,  Y.,  Sherali,  H.D.,  Kwon,  I., and  Kim,  S.:  A New  Ozekici, S.: See Erdem,  A.S.,  101 
Reformulation  Approach  for  the  Generalized  Partial  Ozkaya, B.Y., Giirler, U., and Berk, E.: The Stochastic Joint 
Covering Problem,  170  Replenishment  Problem:  A New  Policy,  Analysis,  and 
Leung, J.Y-T.,  Li, H., and Pinedo,  M.: Approximation  Al-  Insights, 525 
gorithms  for  Minimizing  Total  Weighted  Completion 
Time of Orders on  Identical  Machines  in Parallel,  243  Paul,  A., and  Vakharia,  A.J.:  Requirements  Planning  for 
Li, C.-L., and Chen, Z.-L.: Bin-Packing Problem with Con-  Modular Products, 418 
cave  Costs of Bin Utilization,  298  Pendharkar,  P., and  Nanda,  S.:  A Misclassification  Cost- 
Li, H.: See Leung, J.Y-T.,  243  Minimizing  Evolutionary—Neural  Classification  Ap- 
Liao, H., and Elsayed, E.A.:  Reliability  Inference  for Field  proach, 432 
Conditions  from Accelerated  Degradation Testing, 576  Pinedo,  M.: See Leung, J.Y-T.,  243 
Lim,  A., and Xu, Z.: The  Bottleneck  Problem  with  Mini- 
mum  Quantity Commitments,  91  Raturi, A.S.:  See Liu, Y., 485 
Lin, D., and Makis, V.: On-Line Parameter Estimation for a  Ray, S.: See Chen, Y.(F.),  117 
Partially Observable System Subject to Random Failure,  Rogers, J.S.: See Kwon, R.H., 713 
477  Rojanasoonthon,  S.: See Bard, J.F., 24 
Linetsky, V.: See Birge, J., 601  Rothblum,  U.G.: See Golany, B., | 
Liu, J., Wan, Y.-w., and Wang, L.: Quay Crane Scheduling  Roundy, R.O.: See Huh, W.T.,  137 
at Container Terminals To Minimize the Maximum Rel-  Ryan, J.K.:  See Zhao, H., 547 
ative Tardiness of Vessei  Departures, 60 
Liu, Y., Fry, M.J., and Raturi,  A.S.:  Vertically  Restrictive  Samorodnitsky,  G.: See Gaver, D.P., 588 
Pricing  in  Supply  Chains  with  Price-Dependent  De-  Schmidt, G.: See Kubzin,  M.A.,  16 
mand, 485  Sengupta,  B.: See Giloni, A., 261
Author Index 
Shabtay, D., and Kaspi, M.: Minimizing the Makespan  in  Vairaktarakis,  G.L.: See Szmerekovsky, J.G., 272 
Open-Shop  Scheduling  Problems  with  a Convex  Re-  Vakhania,  N.: See Shchepin,  E., 502 
source  Consumption Function,  204  Vakharia,  A.J.: See Paul, A., 418 
Shchepin,  E., and Vakhania,  N.: An Absolute  Approxima-  Vossen, T., and Ball, M.: Optimization and Mediated  Bar- 
tion Algorithm for Scheduling Unrelated Machines, 502  tering Models for Ground  Delay Programs, 75 
Shen, Z.-J.M.:  See Chen, G., 617 
Sherali, H.D.: See Lee, Y., 170  Wakolbinger, T.: See Cruz, J.M., 674 
Simchi-Levi,  D.: See Martinez-de-Albéniz,  V., 603  Wan, Y.-w.:  See Liu, J., 60 
Simonoff, J.S.: See Giloni, A., 261  Wang, C.-H.:  Optimal Production  and Maintenance  Policy 
Slikker, M.: Relaxed Sequencing Games Have a Nonempty  for Imperfect Production  Systems,  151 
Core, 235  Wang, L.: See Liu, J., 60 
Sokol, J.S.: See Kvam, P., 788  Washburn, A.: A Sequential Bayesian Generalization of the 
Song, Y.: See Chen, Y.(F.),  117  Jelinski-Moranda  Software  Reliability  Model, 354 
Strusevich,  V.A.:  See Kubzin, M.A.,  16 
Szmerekovsky,  J.G., and Vairaktarakis,  G.L.:  Maximizing  Xu, X., and Birge, J.R.: Equity Valuation,  Production,  and 
Project Cash Availability,  272  Financial  Planning:  A  Stochastic  Programming  Ap- 
proach, 641 
Temsamani,  J., and Carrasco,  J.A.:  Transient  Analysis  of  Xu, Y.: See Gurnani,  H., 448 
Markov  Models  of Fault-Tolerant  Systems  with  De-  Xu, Z.: See Lim, A., 91 
ferred Repair Using Split Regenerative  Randomization, 
318  Yau, S.: See Kwon, R.H., 713 
Thomas, L.C.: See Archibald, T.W., 217  Yeung, T.G., and Mason, S.J.: Using Real Options Analysis 
Topaloglu, H., and Kunnumkal,  S.: Approximate Dynamic  to Value Reoptimization Options in the Shifting Bottle- 
Programming  Methods  for  an  Inventory  Allocation  neck Heuristic, 285 
Problem under Uncertainty,  822 
Toptal, A., and Cetinkaya, S.: Contractual  Agreements for  Zabarankin,  M.,  Uryasev,  S., and  Murphey,  R.:  Aircraft 
Coordination  and Vendor-Managed  Delivery under Ex-  Routing under the Risk of Detection,  728 
plicit Transportation Considerations,  397  Zhao,  H.,  Deshpande,  V.,  and  Ryan,  J.K.:  Emergency 
Tzur, M.: See Anily, S., 157  Transshipment in Decentralized Dealer Networks: When 
to Send and Accept Transshipment  Requests, 547 
Uryasev, S.: See Chen, G., 617  Zhou, S.: See Jin, N., 383 
Uryasev, S.: See Zabarankin,  M., 728  Zhupanska, O.I.: See Jeffcoat,  D.E., 814