Table Of ContentM/S MEGHMANI FINECHEM 
LTD. 
 
EIA & EMP Report for Expansion of 
Chlor-Alkali Plant and Manufacturing 
of New Agro-Intermediates and 
Synthetic Organic Products at Plot No.: 
CH-1/CH-2, GIDC Industrial Estate, 
Dahej II, Taluka: Vagra, District: 
Bharuch, State: Gujarat. 
JULY, 2017 
   
   
 
  Kadam  
Environmental Consultants 
www.kadamenviro.com 
 Environment for Development
EIA & EMP REPORT FOR EXPANSION OF CHLOR-ALKALI AND 
M/S. MEGHMANI  MANUFACTURING OF NEW SYNTHETIC ORGANIC PRODUCTS AND AGRO- QUALITY CONTROL 
FINECHEM LTD.  INTERMEDIATES PRODUCTS   SHEET 
 
M/S MEGHMANI FINECHEM LTD. 
EIA & EMP Report for Expansion of Chlor-Alkali 
Plant and Manufacturing of New Agro-
Intermediates and Synthetic Organic Products at 
Plot No.: CH-1/CH-2, GIDC Industrial Estate, Dahej 
II, Taluka: Vagra, District: Bharuch, State: Gujarat. 
© Kadam Environmental Consultants (‘Kadam’), July, 2017 
This report is released for the use of the Meghmani Finechem Ltd, Regulators and relevant 
stakeholders solely as part of the subject project’s Environmental Clearance process. Information 
provided (unless attributed to referenced third parties) is otherwise copyrighted and shall not be used 
for any other purpose without the written consent of Kadam. 
 
 
 
 
 
 
 
QUALITY CONTROL 
EIA & EMP Report for Expansion of Chlor-Alkali Plant and Manufacturing of New Agro-
Name of 
Intermediates and Synthetic Organic Products at Plot No.: CH-1/CH-2, GIDC Industrial 
Publication 
Estate, Dahej II, Taluka: Vagra, District: Bharuch, State: Gujarat. 
Revision 
Project Number  1521721306  Issue No.  1  1  Released  July, 2017 
No. 
DISCLAIMER 
Kadam has taken all reasonable precautions in the preparation of this report as per its auditable quality plan. 
Kadam also believes that the facts presented in the report are accurate as on the date it was written. However, it 
is impossible to dismiss absolutely, the possibility of errors or omissions. Kadam therefore specifically disclaims 
any liability resulting from the use or application of the information contained in this report. The information is not 
intended to serve as legal advice related to the individual situation. 
 
KADAM ENVIRONMENTAL CONSULTANTS | JULY, 2017  I
EIA & EMP REPORT FOR EXPANSION OF CHLOR-ALKALI AND 
M/S. MEGHMANI  MANUFACTURING OF NEW SYNTHETIC ORGANIC PRODUCTS AND AGRO- QUALITY CONTROL 
FINECHEM LTD.  INTERMEDIATES PRODUCTS   SHEET 
 
 
KADAM ENVIRONMENTAL CONSULTANTS | JULY, 2017  II
EIA & EMP REPORT FOR EXPANSION OF CHLOR-ALKALI AND 
M/S. MEGHMANI  MANUFACTURING OF NEW SYNTHETIC ORGANIC PRODUCTS AND AGRO- QUALITY CONTROL 
FINECHEM LTD.  INTERMEDIATES PRODUCTS   SHEET 
 
 
 
KADAM ENVIRONMENTAL CONSULTANTS | JULY, 2017  III
EIA & EMP REPORT FOR EXPANSION OF CHLOR-ALKALI AND 
M/S. MEGHMANI  MANUFACTURING OF NEW SYNTHETIC ORGANIC PRODUCTS AND AGRO- QUALITY CONTROL 
FINECHEM LTD.  INTERMEDIATES PRODUCTS   SHEET 
 
  
 
 
KADAM ENVIRONMENTAL CONSULTANTS | JULY, 2017  IV
EIA & EMP REPORT FOR EXPANSION OF CHLOR-ALKALI AND 
M/S. MEGHMANI  MANUFACTURING OF NEW SYNTHETIC ORGANIC PRODUCTS AND AGRO-
FINECHEM LTD.  INTERMEDIATES PRODUCTS   TABLE OF CONTENT 
 
CONTENTS 
1  INTRODUCTION .......................................................................................... 1 
1.1  PURPOSE OF THE REPORT ........................................................................... 1 
1.2  IDENTIFICATION OF PROJECT & PROJECT PROPONENT ....................................... 1 
1.2.1  Identification of Project ......................................................................... 1 
1.2.2  Project Proponent ................................................................................ 1 
1.3  BRIEF DESCRIPTION OF THE PROJECT AND ITS IMPORTANCE TO THE COUNTRY & 
REGION ......................................................................................................... 2 
1.3.1  Brief Description of the Project ................................................................ 2 
1.3.2  Importance of Project to the Country and the Region ..................................... 2 
1.4  REGULATORY FRAMEWORK ......................................................................... 3 
1.4.1  Status of Environmental Clearances and CC&A for Existing Units ....................... 3 
1.4.2  Statutory Clearance as Other Permissions ................................................... 4 
1.5  SCOPE OF THE STUDY ................................................................................ 4 
2  PROJECT DESCRIPTION ............................................................................. 16 
2.1  TYPE OF PROJECT ................................................................................... 16 
2.2  NEED FOR THE PROJECT ........................................................................... 16 
2.2.1  Caustic Soda Plant ............................................................................. 16 
2.2.2  Synthetic Organic Products ................................................................... 16 
2.2.3  Agro Intermediates ............................................................................ 17 
2.3  LOCATION OF THE PROJECT ...................................................................... 17 
2.3.1  General Location of the Site .................................................................. 17 
2.3.2  Location Map ................................................................................... 17 
2.3.3  Project Boundary ............................................................................... 20 
2.3.4  Approach to the Project Site ................................................................. 25 
2.4  SIZE OR MAGNITUDE OF OPERATION ........................................................... 26 
2.4.1  Production Capacity ........................................................................... 26 
2.4.2  Cost of the Proposed Project ................................................................. 27 
2.5  UTILITIES ............................................................................................ 27 
2.6  PROPOSED SCHEDULE FOR APPROVAL AND IMPLEMENTATION ............................ 28 
2.7  TECHNOLOGY AND PROCESS DESCRIPTION ................................................... 28 
2.7.1  Dichloro Benzene (Ortho/ Meta/ Para) ..................................................... 29 
2.7.2  Trichloro Benzene (1, 2,4/ 1,2,3) ........................................................... 31 
2.7.3  3,4- Xylidine / 2,6- Xylidine .................................................................. 33 
2.7.4  Meta Phenoxy Benzaldehyde Alcohol (MPB Alcohol) ..................................... 35 
2.7.5  Chloromethane ................................................................................. 36 
2.7.6  Chloro Benzene &/Or MCAA &/Or TCAC .................................................... 38 
2.7.7  Epichlorohydrin ................................................................................. 43 
2.7.8  Epoxy Resins .................................................................................... 45 
2.7.9  Poly Aluminium Chloride ...................................................................... 47 
2.7.10  Chlorinated Poly Vinyl Chloride (CPVC) .................................................. 49 
KADAM ENVIRONMENTAL CONSULTANTS | JULY, 2017  V
EIA & EMP REPORT FOR EXPANSION OF CHLOR-ALKALI AND 
M/S. MEGHMANI  MANUFACTURING OF NEW SYNTHETIC ORGANIC PRODUCTS AND AGRO-
FINECHEM LTD.  INTERMEDIATES PRODUCTS   TABLE OF CONTENT 
 
2.7.11  Caustic Soda (100%) ....................................................................... 51 
2.8  PROJECT DESCRIPTION ............................................................................ 55 
2.8.1  Raw Material Details ........................................................................... 55 
2.8.2  Storage Facilities ............................................................................... 56 
2.8.3  Solvent and Solvent Recovery System ...................................................... 61 
2.8.4  Catalyst .......................................................................................... 62 
2.8.5  Air Emissions & Online Monitoring Systems ............................................... 63 
2.8.6  Water Consumption, Waste Water Generation & Disposal Details ..................... 70 
2.8.7  Solid and Hazardous Waste Identification, Quantification, Storage and Disposal ... 81 
2.9  PROJECT LAYOUT AND COMPONENTS .......................................................... 84 
2.10  MITIGATION MEASURES AT DESIGN STAGE ................................................. 85 
2.11  ASSESSMENT OF NEW AND UNTESTED TECHNOLOGY ..................................... 85 
2.12  CONDENSED DESCRIPTION OF ASPECTS FROM PROPOSED PROJECT .................. 85 
3  DESCRIPTION OF THE ENVIRONMENT ......................................................... 87 
3.1  STUDY AREA ......................................................................................... 87 
3.2  PERIOD ............................................................................................... 87 
3.3  COMPONENTS ....................................................................................... 87 
3.4  METHODOLOGY ..................................................................................... 87 
3.4.1  Primary data Collection ....................................................................... 87 
3.4.2  Secondary Data Collection .................................................................... 90 
3.5  ESTABLISHMENT OF BASELINE FOR VALUED ENVIRONMENTAL COMPONENTS ......... 90 
3.5.1  Long Term Meteorology ...................................................................... 90 
3.5.2  Site Specific Meteorology ..................................................................... 92 
3.5.3  Land Use ........................................................................................ 96 
3.5.4  Ambient Air Quality ........................................................................... 105 
3.5.5  Noise ............................................................................................ 110 
3.5.6  Vibrations ....................................................................................... 113 
3.5.7  Hydrology and Ground Water ............................................................... 113 
3.5.8  Geological Environment ...................................................................... 124 
3.5.9  Soil .............................................................................................. 126 
3.5.10  Ecology & Biodiversity ..................................................................... 131 
3.5.11  Socio-Economics ............................................................................ 139 
4  ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES ........148 
4.1  INVESTIGATED ENVIRONMENTAL IMPACTS DUE TO THE PROPOSED PROJECT ........ 148 
4.2  AIR ENVIRONMENT ................................................................................ 153 
4.2.1  Sources of Emissions, Emission rates & Predicted GLCs ................................ 155 
4.2.2  Incremental Traffic ........................................................................... 160 
4.3  NOISE ENVIRONMENT ............................................................................ 163 
4.4  WATER ENVIRONMENT ........................................................................... 170 
4.4.1  Mitigation Measures for Impacts on Surface Water ..................................... 170 
4.5  LAND ENVIRONMENT .............................................................................. 172 
4.5.1  Land Acquisition leading to change in Land Use / Cover ............................... 172 
KADAM ENVIRONMENTAL CONSULTANTS | JULY, 2017  VI
EIA & EMP REPORT FOR EXPANSION OF CHLOR-ALKALI AND 
M/S. MEGHMANI  MANUFACTURING OF NEW SYNTHETIC ORGANIC PRODUCTS AND AGRO-
FINECHEM LTD.  INTERMEDIATES PRODUCTS   TABLE OF CONTENT 
 
4.5.2  Site Preparation ............................................................................... 172 
4.5.3  Green Belt Development ..................................................................... 172 
4.5.4  Mitigation Measures for Impact on Land Use / Land Cover ............................ 172 
4.6  ECOLOGY & BIODIVERSITY ...................................................................... 174 
4.6.1  Ecological Impact Assessment Methodology ............................................. 174 
4.7  SOCIO-ECONOMIC ENVIRONMENT ............................................................. 176 
4.7.1  Occupational Health and Risk to Surrounding Communities ........................... 176 
5  ANALYSIS OF ALTERNATIVES ....................................................................179 
5.1  SITE SELECTION ................................................................................... 179 
5.2  EXISTING SITE ..................................................................................... 179 
5.3  TECHNOLOGY SELECTION ........................................................................ 179 
6  ENVIRONMENTAL MONITORING PROGRAM .................................................180 
6.1  AIR ENVIRONMENT ................................................................................ 180 
6.2  NOISE ENVIRONMENT ............................................................................ 180 
6.3  WATER ENVIRONMENT ........................................................................... 180 
6.4  LAND ENVIRONMENT .............................................................................. 180 
6.5  ECOLOGY & BIODIVERSITY ...................................................................... 180 
6.6  ENVIRONMENTAL MONITORING AND MANAGEMENT COST ................................ 187 
6.7  SOCIO-ECONOMIC ENVIRONMENT (CSR ACTIVITIES) ...................................... 188 
7  ADDITIONAL STUDIES ..............................................................................189 
7.1  PUBLIC CONSULTATION .......................................................................... 189 
7.2  RISK ASSESSMENT ................................................................................. 190 
7.2.1  Scope & Methodology ........................................................................ 190 
7.2.2  Hazard Identification ......................................................................... 190 
7.2.3  Selection of Maximum Credible Loss Scenarios (MCLs’) ................................ 195 
7.2.4  Simulation of Release and Development of Contours ................................... 196 
7.2.5  Disaster Management Plan .................................................................. 214 
7.2.6  Traffic Risk Assessment ...................................................................... 237 
7.2.7  Training Rehearsal and Records ............................................................ 241 
8  PROJECT BENEFITS ..................................................................................242 
8.1  PHYSICAL INFRASTRUCTURE .................................................................... 242 
8.2  SOCIAL INFRASTRUCTURE ....................................................................... 242 
8.3  EMPLOYMENT POTENTIAL ........................................................................ 242 
8.4  OTHER TANGIBLE BENEFITS ..................................................................... 242 
9  ENVIRONMENTAL COST BENEFIT ANALYSIS ................................................243 
10  ENVIRONMENTAL MANAGEMENT PLAN ....................................................244 
10.1  INTRODUCTION ................................................................................. 244 
10.2  PURPOSE OF EMP ................................................................................ 244 
10.3  ENVIRONMENT MANAGEMENT PLAN ......................................................... 244 
KADAM ENVIRONMENTAL CONSULTANTS | JULY, 2017  VII
EIA & EMP REPORT FOR EXPANSION OF CHLOR-ALKALI AND 
M/S. MEGHMANI  MANUFACTURING OF NEW SYNTHETIC ORGANIC PRODUCTS AND AGRO-
FINECHEM LTD.  INTERMEDIATES PRODUCTS   TABLE OF CONTENT 
 
10.3.1  Air Environment ............................................................................ 246 
10.3.2  Noise Environment ......................................................................... 247 
10.3.3  Water Environment ........................................................................ 247 
10.3.4  Solid and Hazardous waste Management .............................................. 248 
10.3.5  Soil Environment ........................................................................... 248 
10.3.6  Ecology and Biodiversity Environment .................................................. 249 
10.3.7  Concept of Waste Minimization, Recycle, Reuse / Recovery ........................ 253 
10.3.8  Environmental Management Cell ........................................................ 254 
10.3.9  Reporting mechanism of Non-Compliance / Violations of Environmental Norms 255 
11  SUMMARY & CONCLUSION .....................................................................256 
11.1  PROJECT DESCRIPTION ........................................................................ 256 
11.1.1  Company and Project Proponent ........................................................ 256 
11.1.2  Proposed Project ........................................................................... 256 
11.1.3  Location of the Project .................................................................... 257 
11.1.4  Project Cost ................................................................................. 257 
11.1.5  Raw Materials and Source ................................................................ 257 
11.1.6  Utilities ....................................................................................... 258 
11.1.7  Process ....................................................................................... 258 
11.1.8  Waste Water ................................................................................ 258 
11.1.9  Air Emissions ................................................................................ 259 
11.1.10  Hazardous and Other Solid Wastes ...................................................... 259 
11.2  DESCRIPTION OF THE ENVIRONMENT ...................................................... 259 
11.2.1  Study Period and Area ..................................................................... 259 
11.2.2  Land use and Land cover ................................................................. 259 
11.2.3  Meteorology ................................................................................. 259 
11.2.4  Ambient Air Quality ........................................................................ 260 
11.2.5  Traffic Survey ............................................................................... 260 
11.2.6  Noise ......................................................................................... 260 
11.2.7  Surface Water and Ground Water Quality .............................................. 261 
11.2.8  Soil ............................................................................................ 261 
11.2.9  Biological Environment .................................................................... 261 
11.2.10  Socio-Economic Environment ............................................................. 262 
11.3  ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES ............. 263 
11.3.1  Air Environment ............................................................................ 263 
11.3.2  Traffic ........................................................................................ 263 
11.3.3  Noise Environment ......................................................................... 263 
11.3.4  Water Environment ........................................................................ 263 
11.3.5  Land Environment .......................................................................... 264 
11.3.6  Biological Environment .................................................................... 264 
11.3.7  Socio-Economic Environment ............................................................. 264 
11.4  ENVIRONMENTAL MONITORING PROGRAMME ............................................. 264 
11.4.1  Environmental Monitoring and Management Cost .................................... 265 
11.5  ADDITIONAL STUDIES .......................................................................... 265 
KADAM ENVIRONMENTAL CONSULTANTS | JULY, 2017  VIII
EIA & EMP REPORT FOR EXPANSION OF CHLOR-ALKALI AND 
M/S. MEGHMANI  MANUFACTURING OF NEW SYNTHETIC ORGANIC PRODUCTS AND AGRO-
FINECHEM LTD.  INTERMEDIATES PRODUCTS   TABLE OF CONTENT 
 
11.5.1  Risk Assessment ............................................................................ 265 
11.6  PROJECT BENEFITS ............................................................................. 265 
11.7  ENVIRONMENT MANAGEMENT PLAN ......................................................... 266 
11.7.1  Green Belt ................................................................................... 266 
11.7.2  Environment Management Cell ........................................................... 266 
11.8  CONCLUSION ..................................................................................... 266 
12  DISCLOSURE OF CONSULTANTS ..............................................................268 
12.1  BRIEF RESUME AND NATURE OF CONSULTANCY (KADAM) ............................... 268 
12.2  EIA TEAM MEMBERS ............................................................................ 269 
13  STATUS OF COMPLIANCE OF ENVIRONMENTAL CONDITIONS ......................271 
 
KADAM ENVIRONMENTAL CONSULTANTS | JULY, 2017  IX
Description:Annexure 17: Analysis Results/Quality of Treated Effluents taken by GPCB .  Method of Production: Electrolysis of Brine by Membrane Cell Process .. by using hot water of I therm & II therm with use of cooling tower.  forest include trees such as Aegiceras corniculata, Avicennia alba, Avicennia