Table Of ContentDRAFT 
 
MITIGATION MONITORING AND REPORTING PROGRAM 
PROJECT MANUAL 
COMPONENTS FOR COMPLYING WITH CONSTRUCTION-
RELATED AIR QUALITY REQUIREMENTS 
 
Former Oakland Army Base Redevelopment Project  
Oakland, California 
 
November 11, 2013 
 
 
Prepared For: 
City of Oakland 
250 Frank Ogawa Plaza 
Oakland, California  94612 
PROLOGIS CCIG Oakland Global LLC 
300 Frank Ogawa Plaza 
Oakland, California  94612 
 
Prepared By: 
Architectural Dimensions 
300 Frank H. Ogawa Plaza, Suite 375 
Oakland, California  94612 
Northgate Environmental Management, Inc. 
428 13th Street, 4th Floor 
Oakland, California  94612 
Turner/TopGrade/Flatiron, A Joint Venture 
1111 Broadway, Suite 2100 
Oakland, CA 94607 
 
 
 
                       
James Heilbronner    L. Maile Smith, PG    Momina Jalil 
President    Associate    Engineer 
Architectural Dimensions  Northgate Environmental  Turner/TopGrade/Flatiron
TABLES
TABLE 1 
Standard Conditions of Approval/Mitigation Monitoring and Reporting Program 
 
Mitigation Implementation/ 
Phase 
Monitoring 
Standard Conditions of Approval/Mitigation Measures  Execution/Monitoring Action 
Design & Pre- Design & Pre-
Construction  Construction 
Schedule  Responsibility  Construction  Construction  Operations 
(horizontal)  (vertical) 
(horizontal)  (vertical) 
AESTHETICS, WIND, AND SHADOWS 
SCA AES-1: Lighting Plan: The proposed lighting fixtures shall be adequately shielded  See Project Manual, Section 2.1.  Prior to the  City/Port  X    X     
to a point below the light bulb and reflector and that prevent unnecessary glare onto  Confirm in Project plans:  issuance of an 
adjacent properties. Plans shall be submitted to the Planning and Zoning Division and  • Shield lighting fixtures.  electrical or 
the Electrical Services Division of the Public Works Agency for review and approval. All  • Prevent unnecessary glare onto adjacent properties.  building permit. 
lighting shall be architecturally integrated into the site.   • Architecturally integrate lighting into the site. 
Mitigation 4.11-1: New lighting shall be designed to minimize off-site light spillage;  Confirm in Project plans:  Prior to the  City/Port  X    X     
“stadium” style lighting shall be prohibited.  • Minimize off-site light spillage.  issuance of an 
Modern security lighting is available that directs light toward a specific site, and  • No ‘stadium style’ lighting allowed.  electrical or 
substantially reduces spillage of light onto adjacent properties. The City and the Port  building permit. 
shall require the use of such directional lighting as a condition of approval for 
redevelopment projects throughout the project area. In no case shall the City and the 
Port allow the use of stadium-style lighting, which directs light outward across a broad 
area. 
Mitigation 4.11-3: New active or passive solar systems within or adjacent to the  Confirm in Project plans:  Prior to the  City/Port      X     
project area shall be set back from the property line a minimum of 25 feet.  • Set back active/passive solar systems >25 feet from property line.  issuance of an 
Through design review, the City shall ensure that proposed solar systems are not  • Solar system located such that they do not restrict future development.  electrical or 
located in a manner that would unduly restrict design of future development. Such  building permit. 
conflicts are to be resolved in design review. If the proposed solar system cannot be 
designed to accommodate adjacent actions, it shall be disallowed. 
Mitigation 4.11-4: New construction within the Gateway development area adjacent  Confirm in Project plans:  Prior to the  City      X     
to a parcel containing permitted or existing active or passive solar systems shall  • New construction does not substantially impair operation of existing solar  issuance of an 
demonstrate through design review that the proposed structures shall not  systems.  electrical or 
substantially impair operation of existing solar systems.  building permit. 
Through design review, the City shall ensure that the effectiveness an operation of 
existing or permitted active or passive solar systems shall not be substantially 
impaired. The design of the subsequent proposed structures shall be modified so as 
not to have such an adverse effect. 
Mitigation 4.11-5: The City and Port shall coordinate with respect to the design of  Confirm in Project plans:  Prior to the  City/Port      X     
new, permanent buildings constructed along the Port/Gateway boundary to minimize  • Minimize conflicts over solar access.  issuance of an 
conflicts over solar access.  electrical or 
The City and Port shall coordinate with one another regarding design of subsequent  building permit. 
redevelopment activities within their respective jurisdictions that may affect operation 
of solar installations in the other’s jurisdiction. 
Mitigation 4.11-6: New construction adjacent to a public park or open space shall  Confirm in Project plans:  Prior to the  City/Port  X    X     
demonstrate through design review that development shall not substantially impair  • New construction does not substantially impair public enjoyment of existing  issuance of a 
enjoyment of the public utilizing the space.  public park(s) or open space.  building permit 
Through design review, the City shall ensure that new building or landscaping shall not  • Reduce shade from new building/landscaping to the maximum extent feasible. 
shade existing or proposed parks or open spaces in a manner that would make these 
public spaces substantially less useful or enjoyable to the public. The City may require 
specific building placement, tiered roofs, or other means of reducing shadow effects 
on public opens spaces. It is not the intent of this measure to completely eliminate 
shade in these areas, but to reduce shade to the maximum extent feasible. 
MMRP Project Manual  1   DRAFT Rev. 4 – November 11, 2013 
Former Oakland Army Base Redevelopment Project  
Oakland, California
Description:Dec 12, 2013  project area shall be set back from the property line a minimum of 25 feet. 
Through design review, the City shall ensure that proposed solar systems are not 
located in  the Bay Area Air Quality Management District (BAAQMD): a) Water 