Table Of ContentCache-Aided Heterogeneous Networks: Coverage
and Delay Analysis
Mohamed A. Abd-Elmagid∗†, Ozgur Ercetin†, and Tamer ElBatt∗‡
∗Wireless Intelligent Networks Center (WINC), Nile University, Giza, Egypt.
† Faculty of Engineering and Natural Sciences, Sabanci University, Istanbul, Turkey.
‡Dept. of EECE, Faculty of Engineering, Cairo University, Giza, Egypt.
Abstract—This paper characterizes the performance of a providesamoreflexibilitycomparedtocachingthesamecopy
generic K-tier cache-aided heterogeneous network (CHN), in of contents. Differently from prior works, in this paper we
7 whichthebasestations(BSs)acrosstiersdifferintermsoftheir characterize the performance of a generic K-tier cache-aided
1 spatial densities, transmission powers, pathloss exponents, activ-
heterogeneous network (CHN), in which each tier may adopt
0 ity probabilities conditioned on the serving link and placement
2 caching strategies. We consider that each user connects to the a different probabilistic placement caching strategy.
BSwhichmaximizesitsaveragereceivedpowerandatthesame Our main contribution in this paper is to characterize the
n
time caches its file of interest. Modeling the locations of the performanceofK-tierCHNs.Westudyagenericmodelfora
a
BSs across different tiers as independent homogeneous Poisson
J K-tierCHN,inwhichtheBSsacrosstiersaredistinguishedby
Point processes (HPPPs), we derive closed-form expressions for
4 thecoverageprobabilityandlocaldelayexperiencedbyatypical theirspatialdensities,transmissionpowers,pathlossexponents
2 user in receiving each requested file. We show that our results and activity probabilities conditioned on the serving link.
for coverage probability and delay are consistent with those Moreover, we consider the generic scenario in which the BSs
] previously obtained in the literature for a single tier system. across different tiers may employ different placement caching
T
strategies. Modeling the locations of BSs in each tier as an
I
. independent HPPP, we derive closed-form expressions for the
s I. INTRODUCTION
c coverage probability and local delay experienced by a typical
[ Cache-aided small cell networks (CSNs) have recently user while trying to obtain each cached file in the network.
1 attracted considerable attention in the literature [1]–[5]. [1] Wefurtherobtainasimplifiedexpressionsforthespecialcase
v proposed a new caching architecture, namely, Femtocaching, of having identical pathloss exponents across tiers, through
5 in which the small cell base stations (SBSs) are utilized as which we show the consistence of our obtained results with
3 distributed caching devices with either small or non-existing priorworksforthesingletierheterogeneousnetworkscenario.
7
backhaul capacity but with considerable storage space. At-
6
tributed to the nature of randomness in both the mobile user II. SYSTEMMODEL
0
. locations and the available contents inside caches, stochastic WestudyagenericmodelforaCHNconsistingofK inde-
1
0 geometry is considered to be a very relevant tool for the pendent network tiers. The BSs across tiers are distinguished
7 analysis of CSNs [2]–[5]. In [2], a probabilistic placement by their spatial densities, transmission powers, pathloss ex-
1 caching strategy is adopted at each SBS, in which each of the ponents, activity probabilities conditioned on the serving link
v: popular files is cached with a certain probability. The prime and placement caching strategies. Particularly, the locations
i goal was to characterize the optimal caching probabilities of BSs in the j-th tier are modeled as a HPPP φ with
X j
for different files to maximize the hit probability subject to spatial density λ . We consider a content library composed
j
ar the finite size caches constraints. Modeling the distributions of M different files and assume that each tier’s BSs may
of mobile users and SBSs as HPPPs facilitates the ability adopt a different probabilistic placement caching strategy. Let
to obtain closed-form expressions of various performance p = {p ,p ,...,p } denote the probabilistic placement
j 1j 2j Mj
metrics for different setups of CSNs [3]–[5], e.g., coverage caching strategy employed by the j-th tier’s BSs, where p
mj
probabilityandaverageachievablerate.[3]considereddevice- denotes the probability that a j-th tier’s BS caches file m
to-device(D2D)cachingalongwithsmallcellcachingthrough such that (cid:80)M p = S files,∀j, where S is the cache
m=1 mj j j
the assumption that a subset of the mobile terminals are size associated with the j-th tier’s BSs. Conditioned on the
equipped with finite cache sizes. The SBSs were assumed serving link, each interferer from the j-th tier is assumed to
to cache the same copy of specific popular contents in [3], beindependentlyactivewithprobabilitya .Thisisduetothe
j
[4]. On the contrary, [5] considered that the content library is fact that the BSs may not be always active to save energy or
partitionedintonon-overlappingsubsetsoffiles,andeachSBS to mitigate interference, etc.
can only cache one of them with a certain probability, which According to Slivnyak’s theorem [6], an existing point in
theprocessdoesnotchangethestatisticaldistributionofother
This work was supported in part by the European Unions Horizon 2020
points of the PPP. Therefore, without loss of generality, we
researchandinnovationprogrammeundertheMarieSkodowska-Curiegrant
agreementNo690893. focus on the downlink analysis at a typical user located at the
origin. Given that the typical user is associated with BS i in where A is the probability that the typical user is associated
k
the j-th tier located at Y ∈ φ , the received power at the withthek-thtierandC istheprobabilityofcoveragewhen
ji j nk
typical user is given by the user is associated with the k-th tier to obtain file n. Thus,
C is given by
Precv =P h (cid:107)Y (cid:107)−αj, (1) nk
j j ji ji
where Pj denotes the transmission power of the j-th tier, Cnk =Exnk[P(SIRk(xnk)>τ |xnk)]
αj denotes the pathloss exponent of the j-th tier and hji is (cid:90) ∞ (cid:18) xαkτI (cid:19)
the channel power gain from BS i of the j-th tier and the = P hk0 > nPk |xnk fXnk(xnk)dxnk
0 k
tcyopeifcfiaclieunstesr.wWitehausnsiutmaveeirnadgeeppeonwdeenr,tiR.ea.,yhlejiigihsfaandienxgpocnheanntniaell (=a)(cid:90) ∞EI(cid:20)exp(cid:18)−xαnPkkτI(cid:19)(cid:21)fXnk(xnk)dxnk
random variable with unit mean. 0 k
We assume an open access network, i.e., the typical user (=b)(cid:90) ∞(cid:89)K L (cid:18)xαnkkτ(cid:19)f (x )dx , (5)
Ij P Xnk nk nk
is allowed to connect to any tier without any restrictions. We 0 j=1 k
consider a cell association strategy1, where the typical user
where I denotes the interference power of the j-th tier such
j
connectstotheBSwhichoffersthestrongestaveragereceived that I = (cid:80)K I , L denotes the Laplace transform of I ,
power and caches its requested file. For instance, the index of j=1 j Ij j
f (x ) is the probability density function (PDF) of the
the tier of the BS serving the user request file n is given by Xnk nk
distance between the typical user and the serving BS in the
k=arg max PjRn−jαj, (2) k-th tier. Note that (a) follows from hk0 ∼ exp(1) and (b)
j∈K follows from the definition of Laplace transform along with
where K = {1,2,···,K} and Rnj denotes the distance that fact that Ij, j = 1,2,···,K, are independent random
betweentheuserandtheclosestBSinthej-thtierthatcaches variables. Before proceeding to derive the Laplace transform
file n. of each tier, we provide the PDF of the distance between the
Throughout this paper, we emphasize our analysis on a typical user and the serving BS in the k-th tier, f (x ), in
Xnk nk
scenario where the typical user tries to obtain file n cached the following Lemma.
in the network. According to the thinning theorem of the PPP
Lemma 1. The PDF of the distance between the typical user
[6], the distribution of the k-th tier’s BSs that caches file n and its serving BS ∈φn, that caches file n, is given by
can be viewed as a thinned HPPP φn with density p λ . k
For instance, for a typical user associkated with a BS n∈kφknk f (x )= 2πpnkλkxnkexp(cid:34)−π(cid:88)K p λ P¯2/αjx2/α¯j(cid:35),
located at a random distance x from the user, the signal to Xnk nk A nj j j nk
nk k
j=1
interference ratio (SIR) at the typical user is given by
P α
SIRk(xnk)= (cid:80)Kj=1(cid:80)i∈φjP\Bkkh0kt0jxiP−nkαjhkji (cid:107)Yji (cid:107)−αj, (3) wherePrPo¯jof=: NPokjteatnhdatα¯thje=evαenkjt,{i.Xe.n,kP¯k>=xnα¯kk}=is1e.quivalent to
where B is the index of the serving BS and t is an the event {R >x } conditioned on the association of the
k0 ji nk nk
indicator random variable which represents the activity of BS typical user with a k-tier BS, thus we have
i in the j-th tier. Thus, t takes value 1 with probability
ji P(X >x )=P(R >x |Association index = k).
a and 0 otherwise. Note that we assume the network is nk nk nk nk
j
interference limited, and hence the thermal noise power is The result follows from Lemma 3 in [7] by observing that the
ignored compared to interference power. distribution of R can be obtained from its null probability
nk
as f (r )=2πp λ r exp(cid:0)−πp λ r2 (cid:1) [6].
III. COVERAGEPROBABILITYANALYSIS Rnk nk nk k nk nk k nk
Now, our objective is to derive the Laplace transform of
In this section we derive the coverage probability for the (cid:18)xαkτ(cid:19)
the interference power L nk in order to evaluate the
considered K-tier CHN. The coverage probability is defined Ij P
k
as the probability that a typical user is able to achieve some coverageprobability(5).WefirstderivetheLaplacetransform
threshold SIR, denoted τ, when the user tries to obtain its file of the serving tier’s interference power, i.e., L , and then we
Ik
of interest from its associated BS. Recall that we focus on a derive the Laplace transform of the other tiers’ interference
scenariowherethetypicalusertriestoobtainfilen.Sincethe powers.SincetheservingBSinthek-thtierlocatedatdistance
typical user is associated with at most one tier, from the total x fromthetypicaluser,noneofthek-thtier’sBSswhichare
nk
probability law, the coverage probability of obtaining file n located inside the circle of radius x cache file n. Therefore,
nk
can be expressed as the k-th tier’s BSs located inside and outside the circle of
radiusx constitutetwoHPPPswithdensitiesq λ andλ ,
K nk nk k k
(cid:88)
Cn = AkCnk, (4) respectively, and with activity probability ak, where qnk =
1 − p . L can be determined by evaluating the Laplace
k=1 nk Ik
transform of the k-th tier’s interference power from outside
1NotethatPjRn−jαj isalong-termaverageofPjrecvandfadingisaveraged and inside the circle of radius xnk separately.
out,andhenceitdoesnotincludehji.
Lemma 2. The Laplace transform of the k-th tier’s interfer- tier, ∀j (cid:54)=k, is at least x . Hence, the j-th tier’s BSs located
j
ence power from outside the circle of radius xnk is insideandoutsidethecircleofradiusxj constitutetwoHPPPs
LoIukt(cid:18)xPαnkkkτ(cid:19)=exp(cid:2)−πλkakρ1(k)x2nk(cid:3), (6) wpriothbadbeilnitsyitiaejs,qwnhjeλrjeaqnndj =λj1, −resppnejc.tively, and with activity
where ρ1(m)=τ2/αm(cid:82)τ∞−2/αm 1+u1αm/2 du. Ltfireoermm,tmhoeuatLs4ai.dpeGlatichveeentcrtaihrncasltfeothromef troyapfditichuaesljxu-stheirstiaesrs’osciinatteersfewreitnhcethpeokw-ethr
j
Proof: Following the same approach used in the proof of
Theorem 1 in [8], the result can be obtained as follows Lout(cid:18)xαnkkτ(cid:19)=exp(cid:104)−πλ a P¯2/αjρ (j)x2/α¯j(cid:105), ∀j (cid:54)=k.
Ij P j j j 1 nk
k
LoIukt =Eφk,tki,hki (cid:89) exp(cid:0)−xαnkkτtkihki (cid:107)Yki (cid:107)−αk(cid:1) Proof: The result can be obtained in a similar way as in
Lemma 2 by replacing the radius of the circle x with x
i∈φk\B(0,xnk) nk j
and considering the transmission power of the j-th tier P .
j
(=a)Eφk,tkii∈φk\(cid:89)B(0,xnk)1+xαnkkτtki1(cid:107)Yki (cid:107)−αk traFnosflolorwminogf ththeej-stahmteiera’snainlytesrisferoefncLeepmomwaer4fr,omtheinLsiadpelathcee
circle of radius x is given by the following Lemma.
j
(=b)Eφki∈φk\(cid:89)B(0,xnk)1+xαnkkτa(cid:107)kYki (cid:107)−αk +(1−ak) Lweitmhmthae5k.-Cthontideirt,iotnheedLoanptlhaeceastsroacnisafotiromn ooffththeetyjp-itchaltiuesre’rs
(7)
interference power from inside the circle of radius xj is
(=c)exp−2πλkak(cid:90)x∞nk τ +(xτynk)αk ydy, LiInjs(cid:18)xPαnkkkτ(cid:19)=exp(cid:104)−πλjqnjajP¯j2/αjρ2(j)xn2/kα¯j(cid:105), ∀j (cid:54)=k.
where B(0,x ) denotes the set of k-th tier’s BSs located UsingLemma4and5alongwithexploitingthefactthatthe
nk
inside a circle centered at the origin and with radius x , j-thtier’sinterferencepowerfromoutsideandinsidethecircle
nk
(a) follows from the independence of the random variables of radius xj are independent random variables, the Laplace
h along with the fact that h ∼ exp(1), (b) follows from transformofthej-thtier’sinterferencepowercanbeexpressed
ki ki
the fact that the random variables t are independent and (c) as
ki
follows from the probability generating functional (PGFL) of (cid:18)xαkτ(cid:19) (cid:18)xαkτ(cid:19) (cid:18)xαkτ(cid:19)
L nk =Lout nk ×Lins nk
the PPP along with simple algebraic manipulations. By using Ij P Ij P Ij P
the change of variables u = (y/xnk)2τ−2/αk, the result can k =exp(cid:104)−πλka P¯2/αjx2/α¯j(kρ (j)+q ρ (j))(cid:105).
be directly obtained. j j j nk 1 nj 2
Following the same analysis of Lemma 2, the Laplace
Theorem1. Thecoverageprobabilityofobtainingfilenwhen
transform of the k-th tier’s interference power from inside the the typical user is associated with the k-th tier is
circle of radius x is given by the following Lemma. The
nk
C
proof of Lemma 3 is omitted for brevity. nk
Lemma 3. The Laplace transform of the k-th tier’s interfer- =(cid:90) ∞ 2πpnAkλkxnkexp(cid:34)−π(cid:88)K λjP¯j2/αjx2n/kα¯j(pnj+aj(ρ1(j)+qnjρ2(j)))(cid:35) dxnk.
ence power from inside the circle of radius x is 0 k j=1
nk
Lins(cid:18)xαnkkτ(cid:19)=exp(cid:2)−πλ a q ρ (k)x2 (cid:3), (8) fileBans,eCd o,nisThdeeoterermmin1e,dthbeycopvluegragginegprCobabiinlittoy(o4f).obFtuaritnhienrg-
Ik P k k nk 2 nk n nk
k more, the coverage probability of obtaining any file m in the
where ρ2(m)=τ2/αm(cid:82)0τ−2/αm 1+u1αm/2 du. cporonbteanbtililtiibersaroyfficlaennbaecrdoestserdmififneeredntbtyierrespwlaicthintghotsheeocfaficlheinmg
Exploiting the fact that the k-th tier’s interference power inTheorem1.Next,forthespecialcaseofhavingαj =α, ∀j,
from outside and inside the circle of radius x are indepen- we provide the coverage probability of obtaining file n.
nk
dent random variables, the Laplace transform of the serving Corollary 1. The coverage probability of obtaining file n
tier’s interference power, LIk, can be expressed as when αj =α, ∀j, i.e., α¯j =1, ∀j, is
L (cid:18)xαnkkτ(cid:19)=Lout(cid:18)xαnkkτ(cid:19)×Lins(cid:18)xαnkkτ(cid:19) C =(cid:88)K pnkλk .
Ik Pk Ik Pk Ik Pk n (cid:80)K λ P¯2/α[p +a (ρ (j)+q ρ (j))]
=exp(cid:2)−πλkakx2nk(ρ1(k)+qnkρ2(k))(cid:3). (9) k=1 j=1 j j nj j 1 nj 2 (10)
Thetypicaluserisassociatedwiththek-thtiertoobtainfilen Equation (10) reflects the impact of the probabilistic avail-
if R > P¯1/αjx1/α¯j, ∀j (cid:54)= k. Let x = P¯1/αjx1/α¯j. Given ability of file n at BSs across different tiers on the coverage
nj j nk j j nk
that the typical user with a BS at k-th tier, the distance from probability. Setting p =1, ∀j, leads back to the achievable
nj
the typical user to the closest BS that caches file n in the j-th coverage of conventional K-tier heterogeneous networks [7],
where the requested files were assumed to be available at all where (a) follows from the change of variables u =
BSs. On the other hand, by setting K = 1, we obtain the (y/xnk)2τ−2/αk and ρ3(m) is given by
coverage probability of the single tier CHN
(cid:90) ∞ 1
Cn = p +a (ρ p(1n)1+q ρ (1)), (11) ρ3(m)=τ2/αm τ−2/αm 1−am+uαm/2 du. (16)
n1 1 1 n1 2
Similarly, considering the interference from inside the circle
which is consistent with the obtained result for the single tier
of radius x , we have
nk
scenario studied in [ [9], Theorem 1].
(cid:34) (cid:35)
IV. LOCALDELAYANALYSIS Eφk Lins1 =exp(cid:2)πλkqnkakρ4(k)x2nk(cid:3), (17)
Conditioned on the association of the typical user with the Ik|φk,xnk
k-th tier to obtain file n, the local delay is defined as the where ρ (m) is given by
4
mean number of time slots required for the typical user to
successfully receive file n from its serving BS. We assume ρ (m)=τ2/αm(cid:90) τ−2/αm 1 du. (18)
that if the typical user fails to decode the transmitted file n in 4 0 1−am+uαm/2
acertaintimeslot,thefileisretransmittedinthenexttimeslot. Next, we derive the expectation inside the integral in (14)
Theconditionalsuccessprobabilityinanarbitrarytimeslotis with respect to the PPP of the j-th tier, ∀j (cid:54)= k. The
defined as PCnk|φ = P(SIRk(xnk)>τ |φ,xnk), where φ = corresponding expressions to (15) and (17) for the j-th tier
∪j∈Kφj.Thus,duetotheindependenceofconditionalsuccess case can be found is a similar way, and given respectively by
events over time, the conditional local delay is a geometric
rdaenladyomofvoabritaabinleingwifithlemnecaann1b/ePCexnpkr|eφss[e1d0]a.sHence, the local EφjLout1 =exp(cid:104)πλjajP¯j2/αjρ3(j)x2n/kα¯j(cid:105), ∀j (cid:54)=k,
Dnk =Eφ,xnk(cid:20)P(SIR (x )1>τ |φ,x )(cid:21), (12) Ij|φj,xnk (19)
k nk nk
thusfromthetotalprobabilitylaw,thelocaldelayofobtaining
file n is given by EφjLins1 =exp(cid:104)πλjqnjajP¯j2/αjρ4(j)x2n/kα¯j(cid:105), ∀j (cid:54)=k.
K Ij|φj,xnk
(cid:88) (20)
D = A D . (13)
n k nk
k=1 From (15), (17), (19) and (20) along with taking into account
that P¯ =α¯ =1, we obtain that
Byapplyingsimilaranalysisasin(5),D canbeexpressed k k
nk
as (cid:34) (cid:35)
Eφj L 1 =exp(cid:104)πλjajP¯j2/αjx2n/kα¯j(ρ3(j)+qnjρ4(j))(cid:105),∀j.
Dnk =(cid:90) ∞Eφ(cid:89)K (cid:18)xαkτ1 (cid:19)fXnk(xnk)dxnk Ij|φj,xnk (21)
0 j=1LIj Pnk |φj,xnk Plugging (21) into (14) yields the local delay of obtaining file
k
n when the typical user is associated with the k-th tier, as
(=a)(cid:90)0∞j(cid:89)K=1EφjLIj(cid:18)xPαnkkτ1|φj,xnk(cid:19)fXnk(xnk)dxnk, teTyshptaiecboalrileshmuesder2b.iysTtahhseesoflcooiclalaotelwddinwegliatthyhetohofereokmb-.ttahintiienrgisfile n when the
k
(14)
D (22)
nk
difwfehreenret (tiae)rsf.olIlnowosrdferromtothcheairnadcteepreiznedeDnce,ofwetheshPaPllPnsoowf =(cid:90) ∞ 2πpnkλkxnkexp(cid:34)−π(cid:88)K λ P¯2/αjx2/α¯j(p −a (ρ (j)+q ρ (j)))(cid:35) dx .
nk A j j nk nj j 3 nj 4 nk
calculatetheexpectationinsidetheintegralin(14)withrespect 0 k j=1
to each PPP. We first derive the expectation with respect to
Based on Theorem 2, the local delay of obtaining file n,
the PPP of the serving tier, which can be determined by con-
D , is determined by plugging D (22) into (13). Now, for
n nk
sidering the conditional Laplace transform of the interference
the special case of having α = α, ∀j, we provide the local
j
powerfromoutsideandinsidethecircleofradiusx .Hence,
nk delay of obtaining file n in the following Corollary.
from (7), we have
Corollary 2. The local delay of obtaining file n when α =
j
α, ∀j, i.e., α¯ =1, ∀j, is
j
(cid:34) (cid:35)
Eφk LoIkut|φ1k,xnk =exp2πλkak(cid:90)x∞nk τ −τak+τy(cid:18)xy (cid:19)αkdy Dn =(cid:88)K (cid:80)K λ P¯2/α[p p−nkaλk(ρ (j)+q ρ (j))].
nk k=1 j=1 j j nj j 3 nj 4
(=a)exp(cid:2)πλ a ρ (k)x2 (cid:3), (15) (23)
k k 3 nk
50
Coverage Probability000000000−.........011234567893 0 −25 −20 −15 −10τ (d−B5) 0 CCCCCCCC12121212 5−−−−−−−− IIIIDDDDSSSSSSSS,,,, ,,,,λλλλ 1λλλλ22220////2222λλλλ////λλλλ1111====1111====448844881 5 Local Delay (time slots)11223344−05050505051 5 −10 −5 τ (0dB) 5 DDDDDDDD12121212−−−−−−−−IIIIDDDDSSSSSSSS,,,,1 ,,,,λλλλ 0λλλλ2222////2222λλλλ////λλλλ1111 1111==== ==== 4488 448815 Coverage Probability of file 1 (C) − IS100000000........0123456789 a20.5 1 1 0a.51 0
(a)Coverageprobabilityvs.τ. (b)Localdelayvs.τ. (c)Coverageprobabilityvs.a1 anda2.
Fig.1. NumericalResults.
Setting K =1, leads back to the single tier case where the Fig. 1c shows the effect of changing the activity probabili-
local delay is given by tiesontheachievablecoverageprobabilityoffile1inIScase.
p We use λ2 = 4λ1 and τ = −5 dB. It is observed that the
Dn = p −a (ρ (1n)1+q ρ (1)), (24) coverage probability is a monotonically decreasing function
n1 1 3 n1 4
in both a and a . This is attributed to the fact that either
1 2
which is consistent with the obtained result for the single tier increasing a or a leads to a higher number of active BSs,
1 2
scenario studied in [ [9], Lemma 5]. and hence a higher received interference power at the serving
BS which in turn leads to a lower coverage.
V. NUMERICALRESULTS
VI. CONCLUSION
For clarity of exposition, we focus on a two-tier CHN
Thispaperfocusesontheperformanceanalysisofageneric
with a two-file distributed caching scenario, i.e., K = 2 and
K-tiercache-aidedheterogeneousnetwork.Fortheconsidered
M = 2. We further assume that S = S = 1, i.e., each
1 2 generic model, we drive closed-form expressions for both the
BS in the network either caches file 1 or file 2 only. If not
coverage probability and local delay of obtaining each file
otherwise stated, we use the following parameters, P =0.1,
2 cached in the network. Our results are consistent with those
P = 100P , λ = 1, a = a = 1 and α = α = 4. We
1 2 1 1 2 1 2 in the literature for the scenario of single tier cache-enabled
consider two different placement caching strategies: 1) Iden-
heterogeneous network. As part of our future work, we would
tical placement caching strategy (IS), in which each file has
like to characterize: 1) the performance of closed access cell
the same caching probability across the BSs of the two tiers,
association strategy, and 2) the optimal placement caching
and 2) Different placement caching strategy (DS), in which
strategies to maximize the hit probability.
each file has a different caching probability across the BSs of
the two tiers. Particularly, in IS, we use p11 =p12 =0.2 and REFERENCES
p = p = 0.8, whereas in DS, we use p = p = 0.5,
21 22 11 21 [1] N. Golrezaei, A. F. Molisch, A. G. Dimakis, and G. Caire, “Fem-
p12 =0.2 and p22 =0.8. tocaching and device-to-device collaboration: A new architecture for
In Fig. 1a and 1b, we plot the coverage probability and wirelessvideodistribution,”IEEECommun.Magazine,2013.
[2] B. Blaszczyszyn and A. Giovanidis, “Optimal geographic caching in
the local delay, respectively, as a function of τ for different
cellularnetworks,”inInt.ConferenceonCommun.(ICC),2015.
values of λ2/λ1 and for caching strategies IS and DS. We [3] C.Yang,Y.Yao,Z.Chen,andB.Xia,“Analysisoncache-enabledwire-
use a = a = 0.5 in Fig. 1b. We observe that the coverage less heterogeneous networks,” IEEE Trans. Wireless Communications,
1 2
2016.
probability monotonically decreases as τ increases, whereas
[4] E.Bastug,M.Bennis,M.Kountouris,andM.Debbah,“Cache-enabled
the local delay monotonically increases as τ increases. Also, small cell networks: Modeling and tradeoffs,” EURASIP Journal on
file 2, which has a higher caching probability than file 1 WirelessCommun.andNetworking,2015.
[5] Y.Chen,M.Ding,J.Li,Z.Lin,G.Mao,andL.Hanzo,“Probabilistic
in both scenarios IS and DS, has a higher coverage and a
small-cellcaching:Performanceanalysisandoptimization,”IEEETrans.
lower delay in each caching strategy for every λ2/λ1. Third, VehicularTechnology,2016.
consideringDSscenario,asλ /λ increases,file2experiences [6] M. Haenggi, Stochastic geometry for wireless networks. Cambridge
2 1
UniversityPress,2012.
a higher coverage and a lower delay while file 1 experiences
[7] H.-S.Jo,Y.J.Sang,P.Xia,andJ.G.Andrews,“Heterogeneouscellular
a lower coverage and a higher delay. This is due to the fact networkswithflexiblecellassociation:Acomprehensivedownlinksinr
that increasing λ /λ increases the density of the second analysis,”IEEETrans.WirelessCommunications,2012.
2 1
[8] J. G. Andrews, F. Baccelli, and R. K. Ganti, “A tractable approach to
tier in which file 2 has a higher caching probability. Finally,
coverageandrateincellularnetworks,”IEEETrans.Commun.,2011.
considering IS scenario, as expected, increasing λ2/λ1 has no [9] S.KrishnanandH.S.Dhillon,“Distributedcachingindevice-to-device
effect on the achievable coverage and delay of each file. This networks: A stochastic geometry perspective,” in Asilomar Conference
onSignals,SystemsandComputers,2015.
can be seen from the expressions of coverage and delay in
[10] W. Nie, Z. Yi, F. Zheng, W. Zhang, and T. O’Farrell, “Hetnets with
Corollary1and2,inwhichcoverageanddelaydonotdepend random dtx scheme: Local delay and energy efficiency,” IEEE Trans.
on the spatial densities of tiers for the scenario of IS. VehicularTechnology,2015.