Table Of ContentBuilding & Construction Project “Atal Apartments” located at Shaheed Karnail
Singh Nagar, Pakhowal Road, Ludhiana, Punjab.
By Ludhiana Improvement Trust.
.
AS PER CHECK LIST SEIAA, PUNJAB FOR BUILDING, CONSTRUCTION,
TOWNSHIP AND AREA DEVELOPMENT PROJECTS
Sr. Description
Reply
No.
1. Properly filled Form 1 & 1A Form I & IA are enclosed with the
application.
2. (a) In case(s) where land has already been Land documents are attached as Annexure-
purchased/acquired: 1.
Proof of ownership of land
(b) In case where land is yet to be
purchased/acquired:
Proof of ownership of land (existing owner)
such as copy of latest Jamabandi (not more
than one month old) and credible document
showing status of land acquisition w.r.t.
project site as prescribed in OM dated
07.10.2014 issued by MoEF)
3. Copy of Master Plan of the area showing land Copy of Master Plan of Ludhiana showing
use pattern of the proposed site/certificate project site is enclosed as Drawing-2.
from Competent Authority intimating land use
pattern of the project site as per proposals of
Master Plan of the area.
4. Layout plan duly approved by the Competent Approved Layout Plan of the project is
Authority / Conceptual plan of the project. enclosed as Drawing-3(a).
5. Topographical map of the area showing Toposheet showing project site is enclosed
Contour Plan. In case of Area Development with the application. Contour Plan is
Projects, the Contour Plan should reflect the enclosed as Drawing-4.
true existing physical features of the site and
may be prepared by the project proponent
w.r.t. some permanent reference marks.
6. Status of construction, if any, along with No construction has been done at site; site
photographs from all the four sides. photographs are enclosed as Annexure 2.
7. 500 meter radius map of the area from Google Earth Image showing project site &
periphery of project site clearly indicating the surroundings within 500 m is enclosed as
various industries (specifically red category Drawing 1.
industries) and structures lying in the area.
8. Location plan showing the exact location of Marked layout cum Site Plan showing the
the project site w.r.t. some permanent / location of STP, location of tubewell, Solid
important features of the area and site plan of Waste segregation area, First Aid room, DG
the project showing the following: sets & Transformers is enclosed as
i) Location of STP Drawing-3 (b).
ii) Solid waste storage area Plan Showing rain water recharging pits is
iii) Green belt attached as Drawing-6.
iv) Parking space Landscape plan showing green area details
v) RWH and water recharge pits is attached as Drawing-9.
vi) Fire fighting equipment layout Plan showing Surface & Stilt Parking is
vii) First aid room enclosed as Drawing- 5.
viii) Location of Tubewells Fire Fighting layout is enclosed as
ix) DG Sets and Transformers Drawing-8.
x) Any other utilities
9. Permission of Competent Authority for;
a) Water and Sewerage connection The application for withdrawal of ground
A letter from concerned Local Body / water has been submitted to DC. Copy of
Authority giving details about existing status the same is enclosed as Annexure-9(c).
of sewer connectivity and availability of NOC from MC, Ludhiana regarding
water supply in the area and acceptance of Sewerage & Solid Waste disposal is
Local Body for taking the quantity of sewage enclosed as Annexure-9(a) and
to be generated by the proposed project and Annexure-9(b) respectively.
providing the water supply. Existing position
of public sewer and water supply line duly
marked on the layout map / plan.
b) Collection of Solid waste
10. Water balance chart for summer, rainy and Water Balance Diagrams for different
winter seasons indicating critical requirements seasons i.e. Summer, Winter & Monsoon
season are shown in Conceptual Plan Page
Nos. 5 to 7 as Figure No. 1 to 3
respectively.
11. Availability of adequate land for use of Wastewater generated from the project will
treated sewage and plantation. be treated in STP of 500 KLD capacity
based on MBBR Technology. Treated water
will be recycled for flushing & irrigation
and remaining will be discharged to
Municipal Sewer.
12. Analysis reports of ambient air, ground water Lab reports along with Field data sheets are
and noise levels from NABL/MoEF enclosed as Annexure 10(a) & 10(b)
Accredited laboratories as per detail below: respectively.
(i) The field data sheets as prescribed by Layout map showing the location of
SEIAA, Punjab which are available on the sampling is enclosed as Drawing 11.
official website of SEIAA, Punjab along with
exact location of sampling / monitoring point Email stating intimation for monitoring is
marked on the layout map should be filled at enclosed as Annexure-10(c).
the time of sample collection/monitoring by
the Lab and should be attached with the water,
air, noise & soil monitoring reports.
(ii) Water, air, noise & soil monitoring reports
more than 6 months old or prior to date of
signing of consent letters/agreement with the
land owner shall not be accepted w.e.f. June,
1st 2015 onwards.
(iii) Atleast one groundwater sample from
the shallow / first aquifer and in case
groundwater is to be abstracted for drinking
purposes then atleast one groundwater sample
from the said aquifer should be monitored and
reports be attached accordingly.
13. Quantification of energy saved and renewable Quantification of energy saved is enclosed
energy devices used. as Annexure-11.
14. Drawing showing plumbing systems for use Dual Plumbing Plan along with schematic
of fresh, treated and hot water drawing showing fresh water line, sewer
line & treated line is enclosed as Drawing-
7.
15. Construction schedule (PERT/CPM Chart) PERT Chart is enclosed as Annexure-7.
16. Undertaking(s) for; Affidavit for the same is enclosed as
a) Constitution of Environment Monitoring Annexure-4.
Cell.
b) Use of ready mix concrete or use of fly ash
during construction.
c) To provide Fire Fighting System.
d) To provide wind breaking curtains and
water sprinkling system to minimize dust
emissions during construction phase.
e) To provide adequate safety measures for
the construction workers during the
construction phase.
17. Environmental Management Plan Environment Management Plan mentioning
indicating the following: the Mitigation measures along with
a) All mitigation measures for each item- compliance of various regulations is
wise activity to be undertaken during the enclosed with the application.
construction, operation and the entire life
cycle to minimize adverse environmental Mr. Rakesh Kumar Garg of Ludhiana
impacts as a result of the activities of the Improvement Trust will be responsible for
project. implementation of EMP for 5 years and
b) Compliance of various environmental after that the welfare society of "Atal
regulations. Apartments" will be responsible for the
c) Steps to be taken in case of emergency same.
such as accidents at the site including fire.
d) For how long period the project proponent Capital & recurring cost for the EMP per
will be responsible for implementation of year is given in Table 1(a) & 1(b) of EMP.
EMP and the name of the person(s)
responsible for implementation of EMP.
e) Capital & recurring cost for the EMP per
year and the details of funds for the same.
f) Name of the individual persons /
organization, who will be responsible for
implementation of EMP after the lapse of the
period for which the project proponent is
responsible.
18. Corporate Social Responsibility indicating Ludhiana Improvement Trust being a Govt.
various activities to be undertaken, organization, LIT undertakes various CSR
provisions of funds for the same, the period measures in the region Ludhiana.
for which the same is to be implemented and
the person(s) responsible for the
implementation of the same.
19. Traffic Circulation System and connectivity Plan showing Surface parking and stilt
with a view to ensure adequate parking, parking is enclosed as Drawing-5.
conflict free movements, Energy efficient
Public Transport.
20. Disaster/Risk Assessment and Management Risk Assessment is enclosed with the
Plan. application.
21. Copy of Memorandum of Article & Persons responsible for the development of
Association / partnership deed / undertaking scheme is mentioned below as per the
of sole proprietorship / list of Directors and hierarchy chart:
names of other persons responsible for 1. Chairman
managing the day-to-day affairs of the 2. Superintending Engineer
project. 3. Technical Engineer
4. Assistant Technical Engineer
5. Junior Engineers
22. In case of expansion projects, compliance This point is not applicable as this is the
report of earlier granted environmental fresh application for the Environmental
clearance conditions verified by Northern Clearance.
Regional Office of Ministry of Environment,
Forests & Climate Change, Chandigarh.
23. Copy of presentation to be made before the Agreed
SEAC at the time of appraisal in PDF format
having size less than 25 MB.
24. Soft copy of all documents in compliance to Agreed.
Ministry of Environment & Forests, New
Delhi Office Memorandum No. J-11-
013/19/2012-IA-II(I) dated 31st May, 2012
having size less than 25 MB.
25 For expansion projects: This point is not applicable as this is the
i. All the columns in the application form fresh application for the Environmental
may be got filled in three parallel columns Clearance.
i.e. Existing, Proposed and Total.
ii. In case of increase in no. of story's,
Structural Safety/ Stability Certificate may be
required from the Approved Engineer.
iii. The existing building plan may be got
super imposed with the proposed building
plan and be marked in different colors.
iv. Specify the adequacy of internal water
supply system, sewer line and STP for the
proposed expansion/revision.